Vet a solar subcontractor with an evidence scorecard for scope, verified roles, comparable delivery, site coordination, defects and support continuity.
A solar subcontractor due-diligence scorecard helps a Canadian installation contractor check the firm it plans to engage. Confirm the actual work package, qualified roles, evidence and supervision arrangements before comparing prices. A homeowner review rating does not establish suitability for your subcontract.
Use the same brief for each candidate. Record essential requirements separately from preferences, so a high overall score cannot obscure a missing role, licence or unresolved responsibility.
Record the legal entity, the work it will perform, proposed personnel and any further subcontracting. Obtain the relevant licensing, insurance and workers’ compensation information and verify through the appropriate sources for that work and jurisdiction.
In Ontario, ESA explains Licensed Electrical Contractor verification, including the distinction between the licensed business arrangement and a general trade label. Identify who will perform the electrical work rather than accepting “solar certified” as the answer.
| Review area | Evidence requested | Acceptance question |
|---|---|---|
| Defined work package | Included tasks, exclusions, personnel and interfaces. | Does the candidate accept the actual scope rather than an assumed standard job? |
| Comparable delivery | Relevant references and authorized examples. | Has the team handled similar roof, site and coordination conditions? |
| Technical documentation | Sample installation/quality records with customer details removed. | Can your reviewer trace work to the released design and instructions? |
| Site coordination | Responsible supervisor, access arrangements and issue route. | Who can identify and escalate a conflict before work proceeds? |
| Defect and warranty handling | Contract responsibilities and an example response process. | Who diagnoses, rectifies and pays for the relevant work? |
| Capacity and continuity | Available qualified roles, commitments and escalation cover. | Can the proposed schedule be supported without assuming unlimited overtime? |
For each row, record verified, needs clarification or not applicable, with the evidence reference and reviewer. If you use numerical weights, agree them before reviewing bids and retain the underlying facts. This is a procurement aid, not a safety or regulatory certification.
Give each candidate the same fictional example: an attachment location conflicts with a condition found on site. Ask how the crew identifies the current drawing, records the issue, contacts the responsible designer and receives an accepted instruction.
A useful answer names roles and preserves the change evidence. It does not authorize the crew to redesign an attachment or substitute components informally. The responsible qualified personnel still need to resolve technical and site-safety questions under the applicable requirements.
Before broadening the relationship, review an appropriately scoped initial assignment against the agreed inspection, documentation and acceptance process. Record discrepancies and ask whether the cause was the subcontractor’s execution, your incomplete brief or another interface.
Agree corrective actions, owners and verification. Keep workmanship, missing records and communication issues distinct; each may need a different response. Do not treat a finished invoice as evidence that every handover obligation is complete.
Recheck material changes in personnel, scope, contracting entity or support. Maintain a clear change process and a route for problems after installation. Your client still needs an accountable delivery organization even when several businesses contribute to the work.

Compare five NGO partnership delivery formats for clean energy vendors, with defined outputs,...

Reconcile partner referrals with an event-to-payment ledger for source history, duplicate...

Use co-marketing templates for clean energy partners to document the brief, landing-page...