Solar Project Checklist: Evidence for Each Decision

Use a solar project checklist to record the evidence, owner and open questions for each decision from suitability through installation and operation.

Arshia Jahangiri
4 min

Table of contents

Listen to this article

A solar project checklist should help Canadian homeowners make decisions with evidence, rather than simply collect completed boxes. At each stage, write down the question, the document or assessment that answers it and the person responsible for the next action.

This checklist covers the project as a whole. It does not replace the detailed permit list, a contractor’s design or the utility’s requirements. Use it to see whether the project team has answered the important questions before the next commitment.

Decision 1: is there a feasible project to quote?

Collect electricity use, future heating or vehicle plans, roof records and relevant property restrictions. Ask the project team to assess usable area, shading, roof condition, structure and the proposed electrical connection. Note which findings are preliminary.

Ask the installer to distinguish a resource estimate from a site design. A photograph, roof-area total or system-size recommendation alone does not settle every suitability question. The roof-space guide explains one part of that assessment.

Decision 2: does the proposal describe what you intend to buy?

Request the equipment schedule, layout, installation scope, exclusions, allowances, warranty documents and complete gross price. Keep the quote revision and date visible. Record the assumptions behind annual generation and electricity-value estimates.

If borrowing or a third-party arrangement is proposed, read those obligations separately. Do not count a loan as a discount or treat an unapproved incentive as money already received. Solenery’s personalized rebate discovery and address matching remain premium features in the existing property flow.

Decision 3: what must be resolved before work?

Have the installer identify applicable municipal, electrical, property and utility requirements and who handles each one. Ask which decisions are needed before ordering, installation or operation; the sequence is project-specific.

OEB guidance tells Ontario customers to check utility eligibility and connection before investing. Elsewhere, use the relevant utility’s process. An incentive application does not replace technical approvals.

Keep one decision record

Decision Evidence to retain Open item and owner
Suitability Site findings, roof information and design assumptions. Identify any assessment still needed.
Purchase scope Accepted quote, equipment and layout revision. Name the person answering an exclusion or allowance.
Readiness for work Applicable decisions, submissions and agreed site preparation. Identify the party confirming each dependency.
Completion Relevant inspection, commissioning and utility-status records. List missing documents or corrective work.
Operation Monitoring access, first bills and service information. Assign any unexplained discrepancy.

The record should show uncertainty rather than imply approval. For example, “utility application submitted” and “utility decision received” are different entries. Ask for the actual status instead of assuming submission means permission.

Decision 4: what has actually been completed?

Ask the installer to separate physical installation, inspections, commissioning, connection and document delivery. Obtain the appropriate records and confirmation of the system’s current operating status.

Have normal owner controls and equipment-specific instructions explained. Do not switch on, reconnect or alter equipment yourself to test an unresolved approval or performance issue. Keep the final design consistent with approved changes.

The permit checklist supplies the detailed approval-focused companion. This decision record should point to those records rather than duplicate every jurisdiction’s document requirements.

Decision 5: can you manage the system after handover?

Confirm owner access to monitoring, model and serial records, applicable warranties and a service route. Review the first utility bills against the actual account arrangement. Record a communications gap separately from an equipment fault until its cause is understood.

Follow equipment-specific maintenance instructions and use appropriately qualified service. Keep dated observations, correspondence and work reports together so a later warranty, roof-work or sale question has an evidence trail.

Review the checklist at a commitment, not only at the end

Return to the record before signing, before work and at handover. If a design or scope changes, update the affected evidence and next action rather than leaving an old completed box beside a new proposal.

A useful checklist lets the homeowner and installer explain what is known, what remains unanswered and who acts next. That makes it a working decision aid throughout the project.