To review a solar contract, turn each important promise into a clause you can find, understand and compare with the proposal. Canadian homeowners should read the installation agreement together with its equipment schedule, exclusions and any separate finance or electricity agreement before signing.
This worksheet organizes questions for the contractor and, where needed, an independent adviser. It does not provide legal wording to sign or assume every province has the same consumer rights or contract rules.
Identify the contracting entity, the equipment provider and any lender, lessor or electricity retailer. Record the versions of the quote, layout and schedules incorporated into the agreement. A sales presentation is not automatically part of the signed package.
As an Ontario example, the province’s renovation and repair guidance discusses written scope, estimates, payment, schedule and warranty information. Check the applicable rules for your transaction rather than transferring a provincial example nationally.
| Topic | Find the answer in the document |
|---|---|
| Equipment and work | Which models, quantities, locations and tasks are included? |
| Exclusions or allowances | What is unpriced, and how will the final scope be established? |
| Substitutions | Who approves a replacement model and its price/design consequences? |
| Payments | Which amounts, due conditions, taxes and separate finance obligations apply? |
| Approvals and timing | Who obtains decisions, and how do delays or design changes affect commitments? |
| Completion | Which installation, commissioning, connection and record-delivery milestones count? |
| Service and exit | Who supports the equipment, and what transfer, buyout or removal terms apply? |
Add the clause number, your plain-language understanding and the written clarification needed. Leave a question visible if you cannot find an answer.
Consider the fictional phrase “equivalent equipment may be supplied.” It leaves several questions: equivalent in capacity, dimensions, warranty, appearance or all of those? Who confirms roof fit and technical compatibility? What happens to price or timing?
Ask the contractor how the actual agreement resolves those questions. A new model can affect drawings and other evidence, so accepting a label alone may not preserve the original proposal. This example identifies ambiguity; it is not a suggested replacement clause.
Locate any annual production or bill-saving forecast and its assumptions. If a guarantee influenced the decision, find the actual promise, exclusions, measurement method and remedy. Do not assume a chart creates a contractual performance obligation.
The capacity explanation helps distinguish rated kWp from generated kWh. Neither is the same as guaranteed annual household savings.
For each payment milestone, identify the deliverable and any unresolved dependency. Ask what the agreement provides if required approval is refused, the design changes or work is delayed. Do not assume a deposit percentage, refund right or cancellation period applies nationwide.
Keep installation price, conditional assistance and borrowing charges separate. If there are several agreements, ask which commitment remains if another cannot proceed. A financing signature and a permission to connect are different decisions.
Review warranty documents and service terms separately. Ask about diagnosis, labour, roof access and removal, then identify which provider is responsible. A parts warranty may not explain all service costs.
For an Ontario PPA or third-party arrangement, OEB materials describe the related electricity and equipment documents. Confirm the framework and actual terms for your jurisdiction instead of relying on a generic ownership comparison.
Obtain written clarifications and the final schedules before committing, and retain a complete copy. Use the approval-documents guide to understand records mentioned in the scope.
Bring significant or unclear clauses to an appropriate independent adviser. The useful result is an agreement whose parties, work, payments and unresolved risks you can explain in ordinary language.

Calculate home energy upgrade payback with a clear baseline, net annual benefit and simple...

Assess Ottawa winter solar production with a monthly evidence sheet covering snow assumptions,...

Check net-zero building code claims against the locally applicable code, defined performance...