Solar Approval Documents: What You Need in Each Province

A plain-language guide to the documents behind a home solar approval in Canada, with notes for Ontario, BC, Alberta, Quebec and Atlantic Canada.

solenery
5 min

Table of contents

Solar approval documents are the paperwork your installer, your utility and your local authorities use to confirm that a home solar system is safe, meets the code and is allowed to connect to the grid. Most of the documents are the same everywhere in Canada; what changes by province is who reviews them. Your installer prepares most of this, but knowing what to expect helps you spot gaps before they cause delays.

Solar approval documents almost every project needs

DocumentWhat it showsWho usually prepares it
Site plan or roof layoutWhere the panels, inverter and disconnects goInstaller
Single-line electrical diagramHow the system connects to your electrical panel and meterInstaller or electrical contractor
Equipment spec sheetsPanel, inverter and racking models and certificationsInstaller
Structural review or engineered designThat your roof can carry the panels plus snow and wind loadsInstaller, often with a professional engineer
Electrical permit or notificationThat the electrical work is registered for inspectionLicensed electrical contractor
Utility connection applicationSystem size, equipment and address for grid approvalInstaller, on your behalf
Proof of ownership or authorizationThat you can make changes to the propertyYou
Inspection sign-offs and utility approvalThat the system passed and can operateInspection authority and utility

Equipment connected to the grid must be certified for use in Canada, so inverters and other components need a recognized certification mark. Ask your installer to confirm this on the spec sheets.

Ontario

Grid connection and net metering are handled by your local distribution company (LDC), the utility that delivers your electricity, under Ontario’s net metering regulation, O. Reg. 541/05. Expect:

  • a connection application to your LDC, and a net metering agreement
  • a building permit for rooftop arrays of 5 m² or more, with an engineered design and roof plan. See the City of Toronto’s solar collector guide.
  • an electrical notification of work filed with the Electrical Safety Authority (ESA), followed by an inspection and a Connection Authorization sent to your LDC

Larger systems may need a connection impact assessment from the LDC. Read our step-by-step guide to solar interconnection in Ontario.

British Columbia

BC Hydro customers apply through BC Hydro’s self-generation program. As of July 1, 2026, it replaced net metering for new customers. BC Hydro asks you to apply before installation. Expect:

  • a self-generation application with system and equipment details
  • an electrical permit from Technical Safety BC or your municipality
  • a municipal building permit where your city requires one

Customers of other BC utilities should check with that utility.

Alberta

Home solar is covered by Alberta’s micro-generation rules. For systems under 150 kW, you (or your installer) submit a micro-generation notice to the owner of the local wires, your distribution utility, for assessment. See Alberta’s micro-generation page. Expect:

  • the micro-generation notice with system and site details
  • electrical and, where required, building permits from your municipality or an accredited agency
  • the utility’s confirmation before the system operates

Quebec

Hydro-Québec customers who want to send surplus power to the grid can join its Net Metering Option. Hydro-Québec publishes its self-generation standards and forms. Expect:

  • Hydro-Québec’s enrolment application and the documents it lists
  • electrical work by a contractor licensed by the Régie du bâtiment du Québec (RBQ)
  • any municipal permit your city requires

Atlantic Canada and the territories

Utilities in Nova Scotia, New Brunswick, Prince Edward Island, Newfoundland and Labrador and the territories each have their own application forms and technical requirements. You’ll generally need the same core solar approval documents listed above, plus the local electrical permit and inspection. Nova Scotia’s government has a solar energy page with current programs.

Tips to get your solar approval documents right

  • Ask your installer for a document list at the start and a copy of each document as it’s submitted.
  • Make sure the equipment on the utility application matches what’s installed. A swapped inverter model is a common reason for re-review.
  • Don’t energize the system until the inspection is passed and the utility confirms you can operate.
  • Keep everything together with your warranties. Our solar permit checklist can help.

The bottom line

Your solar approval documents tell the same story everywhere: what you’re installing, how it’s wired, that the roof can hold it and that it passed inspection. Know who reviews them in your province, keep copies of each one, and choose an installer who prepares them routinely. For an overview of the permits themselves, read do you need a solar panel permit in Canada?

Frequently asked questions

What is a single-line diagram for solar?

It’s a simplified electrical drawing that shows how the solar panels, inverter, disconnects, electrical panel and meter connect. Utilities and inspectors use it to review the system.

Do I need an engineer for home solar in Canada?

Sometimes. In Ontario, rooftop arrays of 5 m² or more need a building permit with a design by a professional engineer. Other municipalities may ask for a structural review, especially for older roofs.

Who submits the utility application?

Usually your installer submits it on your behalf, but the account holder often needs to sign or authorize it.