Skip to content
Back to Marketing
Marketing

Solar Case-Study Metric Definition Sheet: Units, Periods and Denominators

Define five solar case-study metric groups with units, periods, denominators and source limits, including labelled production and cost arithmetic.

Arshia Jahangiri
4 min

Table of contents

A solar case-study metric definition sheet should identify units, periods and comparison bases before a contractor publishes a result. A useful solar case study lets another buyer understand what was installed, what was measured and what remains uncertain. Five carefully documented metrics are more useful than an impressive savings headline with no baseline. Do not invent a customer, quotation or result when records are incomplete.

1. System size and scope

State installed DC module capacity and AC inverter capacity separately, with equipment and commissioning dates. Explain whether batteries, roof work or other upgrades were included. This prevents a reader from treating different project scopes as equivalent.

2. Measured production

Report kWh over a defined period and identify the data source and any gaps. Keep modelled annual production distinct from measured results. A short sunny period should not be multiplied into a guaranteed annual outcome.

3. Purchased energy and bill impact

Distinguish generation from household use and utility imports or exports. Show the tariff and billing periods. A lower bill can reflect rate changes, occupancy or another upgrade as well as solar. Fixed charges may remain even when energy imports fall.

4. Project cost and assistance received

State the scope, taxes and whether assistance was actually paid, merely applied for or projected. Loans are repayable financing, not rebates. Explain whether payback is a model and disclose the assumptions rather than presenting it as an observed result.

5. Delivery and customer experience

Use dated milestones—contract, approval, installation and permission to operate—rather than one ambiguous “installed in” number. Quote the customer's actual words with appropriate permission, and describe the period in which they had experience of the system.

Review the general impression

The Competition Bureau's performance-claim guidance explains why claims need proper support. A case study about one property does not establish a typical savings promise. If environmental benefits are included, follow the Bureau's environmental-claims guidance and state the method, boundary and source factors; avoid unsupported tree equivalents.

Keep an internal evidence pack containing source records, calculation steps, permissions and the approved final wording. Make captions and excerpts as precise as the full article. A caveat buried at the bottom cannot rescue a headline that implies every customer will achieve the same result.

Give each metric a reproducible definition

Metric group Definition fields Denominator or period
Installed capacity and scope DC module kW, AC inverter kW and included equipment. As-built configuration and commissioning date; capacities kept separate.
Production Recorded kWh, measurement source and missing intervals. Exact start/end dates; any yield ratio states its capacity denominator.
Purchased energy and bills Imports, exports and charges on their actual basis. Account, billing periods, tariff and comparison conditions.
Capital cost and assistance Gross scope cost, tax treatment and assistance status. Defined project scope and date; repayment kept separate.
Delivery and experience Named milestone dates and attributed owner observations. Calendar or working-day basis and actual experience period.

Check an illustrative production ratio

Suppose a fictional 6 kW DC array records 8,400 kWh over twelve stated months. Dividing 8,400 by 6 gives 1,400 kWh per kW DC for that period. Keep the capacity basis and dates with the ratio. These numbers are invented, not an expected Canadian yield or evidence for another roof.

The ratio does not establish bill savings or service quality. Those questions need their relevant records and comparison. If data is missing, disclose the gap rather than silently presenting an extrapolation as a complete measured year.

Keep money and elapsed time on their own basis

A fictional $30,000 gross project with $2,000 of confirmed paid assistance leaves $28,000 before any separately identified financing or ownership costs. State the scope and tax basis; do not label a loan an additional discount.

Likewise, a two-day installation and a forty-two-day contract-to-operating interval describe different milestones. Name the start, finish and day-count basis instead of advertising one ambiguous completion number.

Share this article